Before wastewater is allowed to enter the facility:
A priority for beginning operations is to plant trees on the site at the earliest time and the largest possible size.
This stabilizes soil, provides shade, prepares for low-maintenance production, and begins to uptake large quantities of water.
A complete inspection is done by the contractor, municipal sanitary engineer and local water authority. This is repeated 3 - 4 months after wastewater starts running through the facility. Only after the second inspection should the final payment be made to the contractor, to ensure that all dykes and structures function.
Materials and equipment for operations are purchased and on site as per Workplan.
Contract between the operator and municipality is signed.
The operating budget is established.
Operator is living on site.
Safety and health procedures are established.
Ponds and waterways are cleaned.
Systems are tested and operational to the extent possible without wastewater inputs.
Example of a daily, weekly and monthly operations checklist is found in the 'Guide to Wastewater Recycling for Tropical Regions' (see homepage).